Home / Project Cases / Supply Chain Synergy for Deep Processing of Copper Materials

Supply Chain Collaboration for Deep Processing of Copper Materials

An Industrial Park · Annual Processing of 50,000 Tonnes · Delivered in 2024

← Back to Project Cases

Project Overview

Indicator Value
Product Type Copper rods and wires
Processing Scale 50,000+ Tonnes
Delivery Year 2024

Services

  • During the expansion phase of a manufacturing enterprise, copper products needed to be delivered in batches over several months to match production plans at different stages.

    There were numerous batches with significant specification differences, phased adjustments in production rhythm, and limited storage space.

    Before supply, we collaborated with the client to break down requirements, defining quantities, specifications, and delivery windows for each phase; during execution, we dynamically fine-tuned based on production rhythm.

    Delivery was highly synchronized with the production plan, reducing ad-hoc adjustments and storage pressure. This model was listed by the client as a standard reference for subsequent projects.

    Client's Core Requirement: Whether delivery revolves around production takt time rather than a fixed schedule.