Home / Project Cases / Annual Supply of Thermal Coal at Ports

Annual Supply of Port Thermal Coal

Caofeidian and Qinhuangdao Ports · Annual Supply of 3 Million Tonnes · Delivered in 2025

← Back to Project Cases

Project Overview

Indicator Value
Supply Category Thermal Coal
Annual Supply Volume 300
Cooperation Years 5+

Services

  • An industrial client planned to introduce a new bituminous coal source to reduce overall costs, aiming to complete the transition without modifying existing boiler equipment.

The boilers are sensitive to volatile matter ranges. While the new coal offers a price advantage, its specification distribution fluctuates.

Based on historical operational data comparison, this coal type poses operational stability risks without adjusting the combustion system. We clearly defined the applicability boundaries to the client rather than proceeding solely on price.

The client postponed the introduction and adopted a more suitable coal type in subsequent evaluations. Although no transaction was formed in the short term, a foundation of trust based on technical judgment was established.

Client's Core Requirement: Clear articulation of which solutions are inapplicable under current conditions.