Background
During its capacity expansion phase, a manufacturing enterprise significantly increased its procurement of electrolytic copper. To meet the requirements of parallel multi-specification usage and warehouse turnover, we leveraged our ten years of supply chain management experience to provide a 'takt-based' delivery solution.
Key Challenges
- Simultaneous use of multi-specification copper materials results in high on-site sorting and adjustment costs
- Limited warehouse space requires precise control over arrival nodes and batch sizes
- Frequent fine-tuning of procurement plans requires high responsiveness from the supply side
Approach
We broke down the overall demand into multi-batch execution plans, confirming specification combinations, arrival times, and stacking locations in advance. Through dynamic scheduling and batch pre-inspection, we reduced on-site secondary processing and ensured materials were synchronized with the production line rhythm.
Outcome
The delivery rhythm closely matched the customer's production plan, significantly improving inventory turnover efficiency. This collaboration model was subsequently incorporated into the customer's long-term supplier evaluation system, enabling process reuse.
Client Feedback
"Whether you truly understand our production rhythm, rather than just completing a single delivery, determines the sustainability of the cooperation."
Our Cooperation Approach
- Match the actual production rhythm: Reasonably split delivery batches based on the customer's production plan
- Clearly confirm specifications and forms: Confirm before each batch delivery to reduce the risk of errors during usage
- Focus on delivery process coordination: Maintain synchronization with the customer's rhythm to ensure material arrival times match the production plan
- Support long-term supply evaluation: Provide reliable options for the customer's long-term supply system through stable delivery and communication